 Domain  System Upgradation
 Project Name  EIRS & Monomer
 Client  Siemens, Kalwa
 Consultant  
 Project Highlights Upgrade automation system from old Modicon PLC to Siemens PCS7
Project Synopsis

The existing Modicon system was upgraded with Siemens PCS7 system. Entire re-wiring & new installation work was done by FOX within record time. The entire plant was taken back in production with new system within 8 days of shutdown.

The system was designed to control all the raw material storage operation, material dosing to reactors & pre-mix vessels, heating cooling control of the reactors. Total four reactors were controlled by the PCS7 system. The product was emulsion & industrial resin.

The hardware was designed with one S7-400 PLCs & approximately more than 2000 IOs. The HMI system was consists of three WinCC stations.